Home Remodeling HVAC
Authority

About this project

In this new four-story townhouse in Capitol Hill, we completed a precision HVAC and interior upgrade designed to preserve the home’s original high-quality finishes.

We installed ductless mini-split systems in every bedroom, upgraded the rooftop condenser, and fully removed electric wall heaters to achieve a clean, minimalist look.

Additional work included hardwood flooring installation with seamless transitions, wall refinishing and repainting, and minor layout reconfiguration to improve functionality.

The result is a quiet, modern, fully climate-controlled home within a brand-new property.

View more
Project Type: Home Remodeling
Location: Seattle, WA
Project duration: 4 months
Home size: 1,570 sq ft - 2002 sq ft
Reviews
"We have to run wires very carefully throughout all floors and that's where we stepped in. We make sure all wires go through past inspection and not at the same time, not doing damage to the existing walls"
Expert Opinion Seattle, WA
View review

Before
Vs After

See the full transformation. From the original layout to the finished design, the AG Construction team carefully reimagined the space to deliver a modern, functional, and beautifully crafted result.

After renovation
Before renovation

Made Possible by the Team

Meet the dedicated professionals who brought this project to life — from planning and permits to the final finishing touches.

Ekaterina Zasorina

Ekaterina Zasorina

Permit Administrator

Temirlan Makhmet

Temirlan Makhmet

Project Manager

Dmitry Galperin

Dmitry Galperin

Construction Manager

Get Inspired by Similar Projects

Explore similar remodeling projects completed by the AG Construction team. See how thoughtful design, and expert craftsmanship transform homes across Seattle and nearby areas.

Imagine this result in your own home — it's completely doable

Meet your dedicated team and get a clear plan for your remodel